HomeTexasLampasas County

Lampasas County, Texas

Shrink-swell clay limits houses without basements on 20% of Lampasas County's mapped land, a higher share than 69% of US counties. A shallow water table limits basements on under 1%.

73.7% of the county is in drought on the October 13, 2026 Drought Monitor map. FEMA's flood data list 25 flood losses here since 2016, 0% of them in buildings with basements. 37% of homes were built before 1980, against 50% nationally; the median home dates from 1990.

Data as of October 13, 2026 · sources

20%

expansive clay: shrink-swell limits slab homes

<1%

high water table: limits basements

74%

in drought, October 13, 2026

37%

of homes built before 1980

Soil under Lampasas County

Expansive clay (limits slab homes)19.8%
High water table (limits basements)0.2%
Septic fields very limited83.1%
Clay swell (LEP, by area)3.8%
High-swell land (LEP 6%+)18.8%
Mapped soil457,024 acres
Soil seriesShare hereSeries nationally: expansive clay
Brackett39%0%
Lampasas7%n/a
Krum6%n/a
Real6%n/a
Nuff5%n/a
Sunev4%n/a
Burnet County: 27%Coryell County: 26%Mills County: 26%San Saba County: 45%Hamilton County: 31%Llano County: 16%Bell County: 55%Williamson County: 60%Lampasas County BurnetCoryellMillsSan SabaHamiltonLlanoBellWilliamsonLampasas
Lampasas County (heavy outline) and nearby counties, shaded by expansive clay share.under 10%10-25%25-40%40-60%60%+

How we count · survey areas TX281 (2025-09-04)

What the numbers mean here

Clay swell averages a linear extensibility of 3.8% by land area here, and 19% of the land reaches USDA's high class (6% or more). Clay like that swells when wet and shrinks when dry, under 20% of the mapped land.

Clay shrinks as it dries: 73.7% of the county is in drought on the latest map, and 20% of Lampasas County's mapped land has shrink-swell clay.

Rain over the 12 months to August 2026: 30.96 in, 1.01 in below the 1991-2020 average year of 31.97 in.

USDA rates 83% of the land very limited for septic absorption fields.

Drought

73.7% of the county is in drought (D1 or worse) on the October 13, 2026 map. Part of the county was in drought in 12 of the last 52 weeks; the most was 100% of its area, in 3 weeks, most recently on the September 29, 2026 map.

October 21, 2025Share of area in drought, weeklyOctober 13, 2026
Category, October 13, 2026Share of county
D0 abnormally dry or worse100%
D1 moderate drought or worse73.7%
D2 severe or worse0%
D3 extreme or worse0%
D4 exceptional0%

Flood losses since 2016

25 flood losses since 2016, $643,196 paid. The worst year was 2025, with 15. Foundations of the buildings, where recorded: 45% slabs, 32% crawl spaces, 23% elevated.

YearFlood losses
20162
20172
20182
20190
20200
20210
20222
20230
20242
202515
2026 to date0

Rain

Average year, 1991-202031.97 in
12 months to August 202630.96 in (-1.01)
202535.48 in (+3.51)
Wettest year since 18951919: 48.39 in
Driest year since 18951954: 14.52 in
Days with 1 inch or more, normal at NIX STORE 1 W (10 mi away)9.6

Homes

Housing units9,871
Median year built1990
Built before 198037%
Built 2000 or later35%
Owner-occupied80%
Median value, owner-occupied$250,400
Single-family detached77%

What repairs cost

Published ranges from cost guides, not quotes. More sources, and where they disagree.

WorkRangeSource
Foundation repair, US $2,200 to $8,200 Fixr, January 27, 2026
Pier-and-beam repair, US $2,000 to $15,000 Fixr, January 27, 2026
Foundation inspection, US $300 to $600 Fixr, January 31, 2025

Cities in Lampasas County

CityExpansive clayHigh water tableHomes
Kempner11%0%491
Lampasas18%0%3,297
Lometa22%0%279

Nearby counties

PlaceDistanceExpansive clayHigh water table
Burnet County, TX 28 mi 27% 0%
Coryell County, TX 29 mi 26% under 1%
Mills County, TX 30 mi 26% under 1%
San Saba County, TX 34 mi 45% 1%
Hamilton County, TX 36 mi 31% under 1%
Llano County, TX 43 mi 16% 0%
Bell County, TX 46 mi 55% 1%
Williamson County, TX 53 mi 60% 1%

Sources: USDA SSURGO (September 4, 2025) · US Drought Monitor (October 13, 2026) · FEMA NFIP v3 (September 9, 2026) · NOAA (August 2026) · Census ACS 2020-2024. Methods · Data status